Travel: Greg Parle - Attend 7th meeting of C.S.I.T.C. Task Force, Switzerland (Contingency)
Abstract
Meeting opened with Axel Dreiling’s presentation of results from CSITC 7001-1
round trial. I have attached following reports:
• Explanation. PDF (explanation of results)
• RT7001-1 General Lab. PDF (results of all labs)
Information data was accepted by committee.
Other reports I have not attached as follows:
• Evaluation of individual lab for each instrument
• Certificates (New addition. One certificate for participation for each labs
instrument and one certificate providing evaluation result for each labs
instrument.
There were 55 labs that participated and 70 instruments. This compares to 40 labs
and 46 instruments for pilot trial 2. CSITC are hoping for 58 labs and 76 instruments
for the next trial. Only 2 Australian labs and 4 instruments participated in CSITC
7001-1 trial. The main reasons why only 2 labs participated are machine problems,
holidays and labs closing down for off season.
Performance details in Final Report
Files in this item
This item appears in the following categories
- 2007 Final Reports
CRDC Final Reports submitted in 2007